4 days till power on

More parts, more gear boxes, more wheels and more electronics were all being received and processed today.  The drive base is nearly done and should be driving by the end of the day tomorrow. Our shooter prototype is still being tweaked and we are way under shooting, so we may have to beef up our shooter if we want to be able to do the long range shots we planned to do.  We only had to take a out a few rivets today because of an error, so we reminded everyone about measure 3 times before you rivet.  Our awards team did not want to be left out of the measure 3 times mantra and realized that they missed some of the chairman’s requirements with 1 day left to write.  So there is a late night ahead to make sure we are compliant with the requirements.

 

  • Drive train – started
  • Bumpers – started
  • Electrical board – started
  • Turret arm prototype – started
  • Turret arm – not started
  • Turntable – started
  • Shooter – not started
  • Vision – started
  • Main code – started
  • Strategy – started
  • Scouting system – started
  • Awards – started

 

 

Here is quick peak into the shop

Leave a Reply

Your email address will not be published. Required fields are marked *

*