2 days till power on

The team started working on the entrepreneurship award in earnest today after we turned in the Chairman’s award.  The awards team was doing a lot of soul searching about where we are as a club and where we want to be in  a few years.

Our mechanical team was also hard at work getting our drive train finished.  We ran into a few hiccups and had to do some rework on the drive train, but are back on track. However, as soon as we put th bumpers on for the first time we realized we did not account for versa block thickness, so we have some rework to do. Our turret team is also making significant headway and only have tensionors left to add.  Our shooter team has also gotten started and should have all of the structures assembled by tonight.

Our electrical team is getting closer to getting the electrical system completely wired and ready to install. We did a power on test of the wired system and had no issues.  Next up we need to create the wire harness for the shooter so that we can get that installed this weekend.

  • Drive train – done
  • Bumpers – started
  • Electrical board – started
  • Turret arm prototype – done
  • Turret arm – started
  • Turntable – started
  • Shooter – started
  • Vision – started
  • Main code – started
  • Strategy – started
  • Scouting system – started
  • Awards – started
    • Chairman’s – done
    • Wood Flowers – done
  • Competition documents – not started
  • Pre-competition scouting – not started
  • Inviting local leaders to events – not started

 

Leave a Reply

Your email address will not be published. Required fields are marked *

*